The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.
Preparation of the construction of the rough construction of reinforced concrete prefabricated halls in Brno
Loukota, Michal ; Boháček, Adam (referee) ; Kantová, Radka (advisor)
The subject of this bachelor's thesis is the realization of prefabricated reinforced concrete hall in brno. It deals with construction-technological execution of the substructure and assembled skeleton. Its content is a technical report of the construction site equipment including the drawing, the solution of transport relations for the transport of materials and machines, technological regulations for earthworks and the assembly of reinforced concrete skeleton, machine assembly, time schedule of implementation and itemized budget for the given technological stage. The work also deals with the quality of the work and safety of work. Furthermore, several schemes of execution of individual structures and alternative foundation of substructure for prefabricated halls are elaborated.
Self service shoping centre - construction technological project
Prusková, Nikola ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the construction technological project of a self-service shopping centre in Stará Plesná village. Time and finance plan, design of machinery and project of building site accessories were elaborated. The work is focused on the main building object SO 101 (Shopping and service centre). For this building pile foundations and top coarse building phase were worked out in greater details. Time plan, item budget and other documents concerning building preparations of object SO 101 are also parts of the work.
Resort Orlík
Pavelka, Šimon Václav ; Utíkal, Aleš (referee) ; Utíkalová, Ivana (advisor)
The subject of the diploma thesis is the elaboration of project documentation for construction of the Orlík Resort. The buildings are detached and are set in a slightly sloping terrain in the cadastral area Kožlí u Orlíka. The main building has two above-ground floors and one underground floor. In the basement, there is a utility room for the whole building and warehouse. Furthermore, the hall is divided into a section for men and a section for women. In these sections, visitors have a dressing room with cabins with showers and toilets. Then there will be a choice of two exercise halls, two massage rooms or a large gym area. On the ground floor, the building is entered via lee to the vestibule and into the spacious hall. In the entrance, there is a reception with storage area and a room with a kitchenette and toilet. The building is also accessible via a second staircase and large glass sliding windows. There is a conference room with adjustable size, a social hall, warehouses, toilets for women and men as well as an office. For employees there is a day room with kitchenette, changing rooms and showers separate for men and women. The upper floor contains two terraces. These are green roofs, where one is partially fitted with tiles, and there is a recognized reinforced concrete skeleton. There is a cleaning room on each floor. There are also processed two apartment houses, illuminated by roof skylights, which are on the plot four times. All buildings are designed from the reinforced concrete skeleton with lined sandstone blocks. The ceilings are made of prestressed hollow panels, and the roofs are green. Apartment house No. 1 is symmetrical and contains two apartments. There is a storage room, lee, vestibule, utility room, toilet, room, bedroom and a large kitchen with living room and terrace access. The large bathroom has a bathtub, glass shower and one sliding door that closes the room with urinal or toilet. Apartment house No. 2 is divided into three apartment
Administrative building of the grounds Lifocolor in Brno - construction technological project
Pšikalová, Hana ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
The subject of the diploma thesis is construction-technological project of gross construction for the administrative production building of the complex Lifocolor. The diploma thesis deals with the solution of the transport routes to the building site, site equipment, technological progress of the reinforced concrete skeleton assembly, inspection and testing plan. In addition, it contains a design of a machine assembly, a safety plan, an environmental plan, an item budget, a timetable, a proposal for an access and a parking space.
The EPS factory, Unicov - carcassing construction
Ježowiczová, Barbora ; Kotek, Lukáš (referee) ; Biely, Boris (advisor)
Subject of this work is pursuance technology of reinforced concrete skeleton of production hall, especialy carcass/rough construction. This bachelor's thesis contains construction and technology report, technological prescription, technology report of plant building site, technology report of transportation, concept of mechanical assembly, inspection and test plan, technology report of health and safety on the construction site. Budget, calculation and time planning, a drawing of the facilities of the construction site, description of transport relations is included in addendum.
Preparation and organization of the production area's construction facility
Řeháček, Martin ; Stehlíková, Jana (referee) ; Vlčková, Jitka Laura (advisor)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
Gmont Cable s.r.o., cable manufacturing plant
Vacek, Václav ; Vostrejž, Dušan (referee) ; Boleslavská, Yvona (advisor) ; Sobotka, Jindřich (advisor)
The bachelor thesis deals with the drawing of the industrial plant, namely the work is focused on the part of the administrative and the employees' background. The assignment of the atelier work is a newly built factory of Gmont Cable s.r.o., which is focused on the production and installation of cable harnesses, cables and conductors. The proposed object will contribute to the growth of the company, which is constantly developing and increasing its capacity. An ambitious investor also includes further product development by cooperating with Brno R & D institutions. The object is designed in rectangular shapes that copy the plot and the surrounding area of the industrial zone. The building is divided into two parts, a two-storey office building with facilities for employees and a production hall. Both of these objects are at the same height level that are joined together in the western part. From the eastern side, these two objects divide the half-closed atrium, which is open to Těžební Street. Thanks to regular column rafters, the entire building is designed as a prefabricated reinforced concrete skeleton, covered with kingspan sandwich panels and a partially glazed facade made of profiled glass call profilit that illuminates the entire interior of the building. The entire building is wheelchair accessible and offers plenty of space for both staff and visitors to park.
Installation skeleton administrative building in Litomerice
Šmíd, Radim ; Šťastný, Jiří (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is a solution of technological stage of assembly of the skeleton of administrative building. It is a building for administrative and office work placed in a town Litoměřice. Supporting system of this building is made of reinforced concrete prefabricated skeleton. This thesis includes technical report, a situation of construction with broader relations of traffic routes, a statement of dimensions for the gross upper construction, technological specification of skeleton installation, a solution of organization of the construction including the drawing of site equipment, time schedule of skeleton installation, proposal of machine assembly, control and test plan of skeleton installation and occupational safety for skeleton installation.
Construction technological project of the annex of the school gymnasium in the town of Hrob
Smrčka, Adam ; Jílek, Jan (referee) ; Mohapl, Martin (advisor)
This diploma thesis deals with the construction technological project of the annex of the school gymnasium in the town of Hrob in the Ústí region. The work contains a technical report of the construction technological project, a coordination situation of the building with the solution of wider relations of transport routes to the construction site, time and financial construction plan for construction objects and a study of the implementation of the main technological stages. For the main construction object, an itemized budget for the shell construction, a graph of the need of workers and machines, and a detailed time schedule were also worked out. The work also includes a construction site equipment project, including drawing documentation for the stages of earthworks and shell construction, and the design of the main construction machinery. As part of the technological regulation, the work deals with the assembly of the prefabricated reinforced concrete skeleton of the gymnasium, including a detailed quality control and test plan for this process. Last, but not least, the work contains a safety and health protection plan for working on the construction site, a noise study, a calculation of the entire building according to THU, a schema of the assembly of the skeleton by a mobile crane including its assessment and a schema of the reach of the truck concrete pump.